Dofer (DOFER), Eskiลehir Seyitgazi รrencik Mahallesi’ndeki arazi GES’ini 1 Kasฤฑm 2026 itibarฤฑyla elektrik รผretimine aldฤฑ. ลirketten KAP’a gรถnderilen bildirime gรถre, 20 Ekim 2026’da Osmangazi Elektrik Daฤฤฑtฤฑm A.ล. (OEDAล) ile Sistem Kullanฤฑm Anlaลmasฤฑ imzalandฤฑ. Proje, 22.253,36 metrekare arazi รผzerinde anahtar teslimi yรถntemiyle 1.312,5 kWe AC / 1.840,80 kWp DC kurulu gรผรงle inลa edildi. 1 Eylรผl 2026 tarihli aรงฤฑklamada inลaatฤฑn tamamlandฤฑฤฤฑ ve tescil ile onay sรผreรงlerinin Kasฤฑm 2026’da biteceฤinin planlandฤฑฤฤฑ belirtilmiลti.
| รzel Durum Aรงฤฑklamasฤฑ (Genel) | |
| Yapฤฑlan Aรงฤฑklama Gรผncelleme mi? | Evet (Yes) |
| Yapฤฑlan Aรงฤฑklama Dรผzeltme mi? | Hayฤฑr (No) |
| Konuya ฤฐliลkin Daha รnce Yapฤฑlan Aรงฤฑklamanฤฑn Tarihi | 17.10.2025, 21.10.2025, 09.12.2025, 03.02.2026, 20.04.2026, 29.06.2026,01.09.2026,19.10.2026 |
| Yapฤฑlan Aรงฤฑklama Ertelenmiล Bir Aรงฤฑklama mฤฑ? | Hayฤฑr (No) |
| Bildirim ฤฐรงeriฤi | |
| Aรงฤฑklamalar | |
ลirketimizin en son 01.09.2026 tarihli รถzel durum aรงฤฑklamasฤฑnda; Eskiลehir ฤฐli, Seyitgazi ฤฐlรงesi, รrencik Mahallesi'nde bulunan 22.253,36 mยฒ'lik arazi รผzerinde anahtar teslimi yรถntemiyle inลa edilen 1312,5 kWe AC / 1840,80 kWp DC kurulu gรผcรผndeki arazi gรผneล elektrik santrali (GES) projemizin inลaat sรผrecinin tamamlandฤฑฤฤฑ ve tescil/onay iลlemlerinin 2026 yฤฑlฤฑ Kasฤฑm ayฤฑ iรงerisinde bitirilmesinin planlandฤฑฤฤฑ kamuoyuna duyurulmuลtu. Sรถz konusu yatฤฑrฤฑmฤฑmฤฑzla ilgili olarak; ยท 20.10.2026 tarihinde Osmangazi Elektrik Daฤฤฑtฤฑm A.ล. (OEDAล) ile Sistem Kullanฤฑm Anlaลmasฤฑ imzalanmฤฑลtฤฑr. ยท Tescil, kabul ve resmi onay iลlemlerinin tamamlanmasฤฑnฤฑ takiben, santralimiz 01.11.2026 tarihi itibarฤฑyla resmen elektrik รผretimine baลlamฤฑลtฤฑr. Kasฤฑm ayฤฑ baลฤฑnda devreye alฤฑnan bu yatฤฑrฤฑmฤฑmฤฑzฤฑn, ลirketimizin sรผrdรผrรผlebilir bรผyรผme hedeflerine, yeลil enerji dรถnรผลรผmรผne ve karlฤฑlฤฑฤฤฑna olumlu katkฤฑ saฤlamasฤฑ beklenmektedir.Kamuoyuna ve yatฤฑrฤฑmcฤฑlarฤฑmฤฑza saygฤฑyla duyurulur. In our company's latest material event disclosure dated September 1, 2026, it was announced that the construction of our ground-mounted solar power plant (SPP) projectโlocated on a 22,253.36 mยฒ plot in the รrencik neighborhood of Seyitgazi district, Eskiลehir province, and built on a turnkey basis with an installed capacity of 1312.5 kWe AC / 1840.80 kWp DCโhad been completed, with registration and approval processes scheduled for finalization in November 2026. Regarding this investment: ยท A System Usage Agreement was signed with Osmangazi Elektrik Daฤฤฑtฤฑm A.ล. (OEDAล) on October 20, 2026. ยท Following the completion of registration, acceptance, and official approval procedures, the power plant officially commenced electricity generation as of November 1, 2026. This investment, which became operational in early November, is expected to contribute positively to our company's sustainable growth objectives, green energy transition, and profitability. Respectfully announced to the public and our investors. | |
*** Bu haber, KAP bildirimi esas alฤฑnarak oluลturulmuลtur. Yatฤฑrฤฑm tavsiyesi niteliฤi taลฤฑmaz. Baฤlayฤฑcฤฑ metin aลaฤฤฑdaki orijinal KAP bildirimidir.
Dofer Yapฤฑ tarafฤฑndan gรถnderilen son KAP bildirimleri
- Dofer Yapฤฑ 3 milyon adetlik pay geri alฤฑm programฤฑ baลlattฤฑ
- Dofer Yapฤฑ 2026 9 aylฤฑk raporunda kapasite ve GES yatฤฑrฤฑmlarฤฑnฤฑ paylaลtฤฑ
- Dofer Yapฤฑ Malzemeleri OcakโEylรผl 2026’da 54,4 milyon TL zarar aรงฤฑkladฤฑ
- Dofer Yapฤฑ’nฤฑn Eskiลehir’deki gรผneล enerjisi santralinin inลaatฤฑ tamamlandฤฑ
- Dofer Yapฤฑ Malzemeleri’nin gรผneล santrali inลaatฤฑ tamamlandฤฑ